Advantages:

 

● The complete set of Early Drop system technology can greatly save the amount of formwork investment and reduce the amount of formwork configuration by 1/3 to 1/2.

● Shorten the construction period, accelerate the construction speed, and improve work efficiency.

● Extend the service life of the template and save construction costs.

 

 

Mainly Components:

 

 
Item Size Weight /KG
 Panel Early-

Dismantling Panel

1800×1800 51.5
1800×1200 34.0
1800×900 24.0
1800×600 20.0
1200×1200 23.0
1200×900 20.0
1200×600 19.0
900×900 12.0
900×600 11.0
Plywood Usage:10-15 times(AAAA Grade) 15.0
Usage:6-8 times(AAA Grade) 14.5
Support

System

 

Head Early-dismantling Deck Bearing 5.0
Adjustable Scaffold adapter 3.1
Steel Prop Prop 350(H=1.90m-3.50m) 3T 18.0
Prop 400(H=2.20m-4.00m) 3T 25.0
Prop 500(H=2.70m-5.00m) 3T 40.0
Connection Frame Connection Frame 1800 12.6
Connection Frame 1200 9.5
Connection Frame 900 8.6
Connection Frame 600 7.8
Push pull prop Push pull prop (L=2.7M~3.5M) 19.4
Side Steel beam With Wood Side steel beam with wood Side steel beam with wood 1800 11.2
Side steel beam with wood 1200 8.2
Side steel beam with wood 900 6.6
Side steel beam with wood 600 5.0
Adjustment Beam Adjustment Beam L=1800 12.1
Adjustment Beam L=1200 8.8
Adjustment Beam L=900 7.1
Transverse Beam with wood Transverse Beam with wood L=1200 2.3
Transverse Beam with wood L=900 1.7
Transverse Beam with wood L=600 1.2

 

 

 

 

icon + 86 15010556710 icon +86 15010556710 icon lawrencewang87@gmail.com icon

Power by: cnwangju.com

Sitemap