Alu Early Drop Form System
U GOOD Alu Early Drop Form System,it’s a fast installation with high efficiency formwork system,could dismantal panel fomwork first,can help fast construction and save panel quantity,when use this system,only use 100% panel + 200% or 300% props,can help jobsite construct reach to 4 – 5 days/floor,all panel is aluminum frame with 11mm plywood ,man power can do it without any crane assist,all system is European product standard and light duty.
Advantages:
● The complete set of Early Drop system technology can greatly save the amount of formwork investment and reduce the amount of formwork configuration by 1/3 to 1/2.
● Shorten the construction period, accelerate the construction speed, and improve work efficiency.
● Extend the service life of the template and save construction costs.
Mainly Components:
Item | Size | Weight /KG | ||
Panel | ![]() |
Early-
Dismantling Panel |
1800×1800 | 51.5 |
1800×1200 | 34.0 | |||
1800×900 | 24.0 | |||
1800×600 | 20.0 | |||
1200×1200 | 23.0 | |||
1200×900 | 20.0 | |||
1200×600 | 19.0 | |||
900×900 | 12.0 | |||
900×600 | 11.0 | |||
Plywood | Usage:10-15 times(AAAA Grade) | 15.0 | ||
Usage:6-8 times(AAA Grade) | 14.5 | |||
Support
System |
|
Head | Early-dismantling Deck Bearing | 5.0 |
Adjustable Scaffold adapter | 3.1 | |||
Steel Prop | Prop 350(H=1.90m-3.50m) 3T | 18.0 | ||
Prop 400(H=2.20m-4.00m) 3T | 25.0 | |||
Prop 500(H=2.70m-5.00m) 3T | 40.0 | |||
Connection Frame | Connection Frame 1800 | 12.6 | ||
Connection Frame 1200 | 9.5 | |||
Connection Frame 900 | 8.6 | |||
Connection Frame 600 | 7.8 | |||
Push pull prop | Push pull prop (L=2.7M~3.5M) | 19.4 | ||
Side Steel beam With Wood | ![]() |
Side steel beam with wood | Side steel beam with wood 1800 | 11.2 |
Side steel beam with wood 1200 | 8.2 | |||
Side steel beam with wood 900 | 6.6 | |||
Side steel beam with wood 600 | 5.0 | |||
![]() |
Adjustment Beam | Adjustment Beam L=1800 | 12.1 | |
Adjustment Beam L=1200 | 8.8 | |||
Adjustment Beam L=900 | 7.1 | |||
![]() |
Transverse Beam with wood | Transverse Beam with wood L=1200 | 2.3 | |
Transverse Beam with wood L=900 | 1.7 | |||
Transverse Beam with wood L=600 | 1.2 |
Power by: cnwangju.com
Sitemap